Once a segment arrives on site from the factory a quality inspection must take place based on the projects particular acceptance criteria. It is at this point that the segments unique identifier is scanned into the system using a mobile device, is inspected and the segment condition is entered based on a list of options. Comments can also be associated with each inspection. To complete the inspection by the contractor the segment is flagged as either accepted, accepted with repairs pending or rejected.